OMS · City Beach cable route
OMS City Beach Cable Route Survey
Fremantle 01 undertook its maiden cable route survey for OMS Group, examining bathymetry around a major cable route between Perth and Singapore.
In 1.5 m waves the vessel was controlled entirely from within the ROC by the coxswain, working alongside a hydrographic surveyor and gathering exceptional quality multibeam data in adverse conditions.
The campaign demonstrated the crewed-to-uncrewed operating model on a live commercial scope, with survey acquisition managed remotely while the platform held station and line in challenging sea state.